Well AFE vs Actual Cost Report – Excel Drilling Cost Variance Tracker for Oil & Gas
Originally published: 30/08/2026 12:46
Publication number: ELQ-16237-1
View all versions & Certificate
certified

Well AFE vs Actual Cost Report – Excel Drilling Cost Variance Tracker for Oil & Gas

An Excel tool that tracks actual well costs against your AFE (Authorization for Expenditure) budget.

Description
This Well AFE vs Actual Cost Report is a formula-driven Excel template built for oil & gas operators, drilling engineers, and project cost controllers who need to track actual well spend against the original AFE budget as drilling progresses. An AFE sets the plan — this tool tracks reality against it, so cost overruns surface early enough to act on, rather than being discovered only after the well is complete and the invoices are in.

The report opens with Well Details (well name, field, spud date, and rig release/completion date), then compares AFE Budget to Actual Cost across the same structured categories used in drilling cost planning: Site Preparation & Mobilization (access roads, rig mobilization, permits), Drilling Rig Cost, Drilling Services & Materials (mud, bits and downhole tools, casing and cementing, directional drilling/MWD, wellhead equipment), Evaluation & Completion (logging, well testing, completion), and Other Costs (transportation, personnel). Every category automatically calculates dollar variance, percentage variance, and a plain Status flag — "Under Budget" or "Over Budget" — with color-coded conditional formatting so problem areas are visually obvious at a glance.

A live KPI strip at the top surfaces the headline numbers immediately: total AFE budget, total actual cost, total variance in dollars and percent, and a count of how many cost categories are currently over or under budget. The Total row rolls up all category subtotals automatically into a final AFE vs Actual comparison for the whole well. Because this report uses the same cost category structure as our companion Drilling & Well Cost Calculator, an AFE estimate built there can be carried directly into this report's Budget column once drilling begins — giving you a consistent cost-tracking workflow from initial estimate through final actuals.

This Best Practice includes
1 excel dashboard file (xlsx) with instruction set

Acquire business license for $10.00

Add to cart

Add to bookmarks

Discuss

Further information

Track actual well costs against the original AFE budget by category as drilling progresses
Automatically calculate dollar and percentage variance without manual formulas
Flag over-budget and under-budget categories instantly with color-coded status
Roll up category-level cost tracking into a single Total AFE vs Actual comparison
Give project managers and cost controllers a fast, KPI-level view of overall cost performance
Support cost accountability conversations and post-well cost review meetings

Oil & gas operators tracking a single well's cost performance against its AFE
Drilling engineers and project cost controllers monitoring spend in real time during drilling
Small to mid-sized operators without dedicated AFE cost-tracking software
Wells following a fairly standard AFE cost category structure
Users who already have an AFE estimate (e.g., from the companion Drilling & Well Cost Calculator) and want to track actuals against it
Post-well cost review and lessons-learned analysis

Multi-well or multi-pad AFE tracking requiring consolidated reporting across several wells simultaneously
Joint-venture or working-interest cost allocation requiring partner-specific cost splits and billing
Offshore wells with substantially different AFE cost structures not reflected in this template
Formal AFE supplement/revision workflows requiring approval chains and version control
Detailed vendor invoice reconciliation or line-item purchase order tracking
Situations requiring certified, audit-ready cost accounting — this is a management-level cost tracking and variance tool, not a substitute for formal project cost accounting or professional review


0.0 / 5 (0 votes)

please wait...