Six Sigma Project Starter Kit
Originally published: 14/09/2026 08:01
Publication number: ELQ-20582-1
View all versions & Certificate
certified

Six Sigma Project Starter Kit

Define the project, prove the money, plan the first 90 days, and score the charter before the kick-off. Free Excel workbook, 5 sheets.

Description
Projects rarely fail because the analysis was too weak. They fail because the problem was never stated in numbers, the goal was a wish rather than a target, the sponsor did not actually control the process, or nobody checked whether the data could be obtained. By the time that becomes obvious the team has spent two months and the credibility is gone.


This free kit is the front end of a DMAIC project, in one Excel workbook.
Benefit Calculator. Turns a defect rate into an annual cost of poor quality and a saving your finance department will recognise, with a payback period on the project cost. Fill this in before you write anything else: if the saving does not justify a project team, choose a different problem. That decision alone is worth more than the rest of the file.


Project Charter. A complete charter form with the guidance for each field written beside it: what a business case has to say, what a problem statement must contain, and what it must never contain. The worked example runs the same numbers as the calculator, so you can see how the pieces connect.


90-Day Plan. Thirty six tasks across Define, Measure, Analyse, Improve and Control, with owners, due days and status, and a progress summary that updates itself. The sequence carries as much of the value as the tasks: measurement system before data collection, stability before capability, FMEA before rollout.
Charter Quality Check. Ten questions that decide whether the charter is ready, scored automatically with a go or no-go verdict. Below seven out of ten, do not hold the kick-off yet. The half hour it takes to fix the gaps is the cheapest half hour in the whole project.


Free to use and to pass on, inside your organisation or outside it. If it helped, a review is the only payment asked.


When you reach the Measure phase and need thestatistics, my Statistical Process Control Excel Toolkit covers control charts,capability and Gage R&R.

This Best Practice includes
1 Excel workbook (.xlsx), 5 worksheets, no macros and no add-ins.

Mohamed Moussa offers you this Best Practice for free!

download for free

Add to bookmarks

Discuss

Further information

After using this workbook you will be able to:

• Calculate the annual cost of poor quality for a process and the saving a project would deliver.
• Decide, on evidence, whether a problem is worth a project team at all.
• Write a problem statement that contains a measure, a location and a timeframe, and no cause or solution.
• Write a goal statement with a baseline, a target and a date, derived from the problem rather than from a wish.
• Define the scope so that the team cannot drift into a process it has no authority to change.
• Plan the first 90 days in the right order, with the sequencing traps already avoided.
• Score your own charter honestly, and know before the kick-off whether it will hold.

• Opening a DMAIC or Lean Six Sigma improvement project of roughly one to six months.
• Green Belts and Black Belts writing their first charters, and Master Black Belts reviewing other people's.
• Organisations building an improvement programme from scratch and needing a consistent way to open projects.
• Any situation where the benefit has to be proved to finance before resources are released.
• Manufacturing and service processes alike; nothing in the kit is specific to a factory.

• You need the statistical analysis itself, such as control charts, capability or a measurement system study. That is a separate tool.
• Your organisation mandates a charter template you are not permitted to change. Use this to check the content, not to replace the form.
• You are running a Kaizen event or a rapid improvement workshop of under two weeks, where a 90 day plan is more structure than the work needs.
• The problem is already understood and the solution is known. That is a task to be implemented, not a project to be analysed.
• You need portfolio or programme management across many projects at once. This kit handles one project.